Having completed over 2,500 arc flash studies for our customers we are confident that the benefits of a Hallam-ICS Arc Flash Analysis include:

• Establishing minimum requirements to prevent hazardous electrical exposures of personnel working on live electrical equipment.

• Ensuring compliance with regulatory agencies, OSHA and NFPA

• Providing the owner with the necessary tools to predict possible electrical system failures to reduce facility downtime.

• Establishing minimum “Personal Protective Equipment” designed to for specific areas of the body.

 

Partial Project Team

Scott-King.jpg

Scott King, Nat'l Director Electrical Safety Services

 My Hallam Story 

 

 

Brian_Crosby-1.jpg

Brian Crosby, Senior Arc Flash Technical Supervisor

 My Hallam Story 

 

 

Power System Arc Flash

Fishersville, VA

Arc Flash

Augusta Health is among the finest community hospitals in America. Located in Fishersville VA, Augusta Health opened in 1994 to continue a tradition of personalized care with small-town hospitality that began more than 50 years ago with predecessor hospitals in Staunton and Waynesboro, Virginia. Today, their highly trained physicians and staff use state-of-the-art technology to provide superlative care with warmth and compassion.

When choosing Hallam-ICS to complete a power system study, Augusta Health shared what was most important to them: “to ensure reliability of their electrical power distribution systems for compliance with OSHA and NFPA 70E Electrical Safety in the Workplace guidelines.” This became everything to Hallam-ICS.

Knowing that it is critical that the electrical systems remain operational 24 hours a day, 365 days a year, Hallam-ICS recommended a 100% survey of all electrical equipment, including: normal power, emergency life safety and critical systems so as to complete a short circuit, coordination and Arc Flash Analysis. With safety being the number priority, Augusta Health knew that there would be certain events that would require their qualified personnel to perform live work on their electrical systems since de-energizing is not option in this type of environment. 

Augusta-Health-Arc-Flash.jpg

Hallam-ICS was able to document the entire electrical distribution systems so as to develop an up to date electrical one-line diagram of the entire facility. In addition, photographs and updated panel schedules were developed for all electrical equipment and included within the study. As the survey was completed, Hallam-ICS documented the locations of all equipment and provided updated floor plans for their use.Arc Flash Webinar Recording Access

When completed, we were able to analyze the incident energy levels and provide recommendations to lower the levels when applicable. Recommendations were also provided to ensure proper coordination of systems so in the event of a failure or faulted situation, the device in question would clear the fault and not shutdown major portions of the facility. When we finished, we provided compliant labels on all equipment identifying the incident energy hazard and proper protective clothing required by qualified personnel when working on live exposed electrical components.