Case Study: Major Semiconductor Manufacturer

Hallam-ICS instituted a “zero defect” policy and developed an in-house web-based design tool that provided automated error checking and generation of PLC code and commissioning documents.

 

Partial Project Team

Kristian Montenegro

Kristian Montenegro, Senior Project Manager

 My Hallam Story 

 

 

Mike-Lorenz.jpg

Mike Lorenz, Mechanical Engineer

 My Hallam Story 

 

 

New Fab Toxic Gas Monitoring System

Northeast United States

Semiconductors 

A leading-edge semiconductor manufacturer committed over $10 Billion to build their campus with a goal of becoming the largest foundry in the United States.  Construction of the new Fab was a significant undertaking with an aggressive schedule. To select a provider of the Toxic Gas Monitoring System (TGMS) for the site, several items were identified as being important:

  • Ability to meet fast-track schedule
  • Attention to detail (Life Safety System)
  • In-house design, programming and commissioning
  • Financial strength (bonding to $10 Million)

New Fab Toxic Gas Monitoring System

Hallam-ICS was chosen to provide the TGMS and what was important to our client became everything to Hallam-ICS.

To meet the schedule and maintain progress, Hallam-ICS staffed the team with experienced in-house project management, TGMS code experts, control system engineers and commissioning engineers. Our team formed a tight connection with the construction manager and the owner, having several progress meetings to make sure the final system met all expectations. The system is based upon Allen-Bradley ControlLogix PLC’s and GE Cimplicity front-end, while utilizing Honeywell gas detection equipment.

Hallam-ICS instituted a “zero defect” policy and developed an in-house web-based design tool that provided automated error checking and generation of PLC code and commissioning documents. This application greatly improved overall quality and enabled Hallam-ICS to meet the aggressive schedule despite regular design changes.

All key project milestone dates were met while also delivering a thoroughly commissioned system to insure a safe and reliable manufacturing environment.