PLC5 Conversion 3-Part Series detail considerations when performing a PLC5 to ControlLogix conversion.
PLC5 to ControlLogix Conversions - Part 1: Custom Solutions to Further Reduce Costs
PLC5 to ControlLogix Conversions - Part 2: 3 Ways to Meet Your Budget
PLC5 to ControlLogix Conversions - Part 3: A multi-year Conversion Case Study
In Julie Gruenholzs' blogs, “6 Questions to ask when upgrading an obsolete control system, while keeping your plant running” & “Replacing Your Obsolete Control System. Step 1 – Replace the SCADA “, she covered the preliminary assessment for converting your legacy control system & recommendations for SCADA upgrades coming first. We cannot proceed to the actual conversion without carefully considering these 6 questions. Her recommendation for executing SCADA upgrades first, is excellent. Particularly since, in most situations, you can run new and old SCADA systems side by side as operators receive training and become accustomed to the new front end.
So, now that we have committed to the conversion process, we need to find the money. Few of us live in a world of limitless funds. We all have a budget. Conversions offer the opportunity for the Generic, Mid-Scale and Gold-Plated versions. If you have a Rockwell Automation (Allen-Bradley) PLC5 installation on an ancient line that still makes money, odds are good that you will have to do a Generic, Low-Cost, conversion. If this is a high-profit line with on-going changes, you may be able to convince management that you need the Gold-Plated conversion. Many of you will land in the middle.
Once you assess the 3 points below, you can circle back and look at the duration of your project:
The higher your tolerance for down-time, the more latitude you have in evaluating the “How-To” of your conversion
2. What about my Program(s)?
You have an existing PLC / SCADA pair that works now. Do you rewrite both the PLC & SCADA to take advantage of new system functionalities; or do you do a straight copy of old code to new PLC and new SCADA drivers to reduce project costs?
Old Panel Boards should be considered carefully. Often, they consume a lot of I/O modules to read or drive the myriad Push-buttons, Lights, Numeric Readouts and Numeric entry devices. In many cases, it will cost you less to network a new Touch Screen to replace the I/O, than it will to upgrade all of that I/O. This can be a place for large savings on your conversion, and should be carefully studied.
In my next blog I will discuss some custom solutions to further reduce costs for a PLC5 to ControlLogix conversion.
Read the next blog in this series:
To date, Hallam-ICS has upgraded more than 100 PLC5 I/O racks on dozens of processors. We have another 25 conversions slated over the next 3 quarters. We are able to execute the physical conversions and the PLC code conversions in a very effective manner. We are also very well versed in converting existing networks to Ethernet for communications. If you have any questions on PLC5 conversion strategies and potential cost savings, please contact me. We are also well versed on several other vendors’ legacy conversions; so don’t hesitate to ask about other platforms. Feel free to contact us as you evaluate your conversion and your budget. We look forward to working with you on your PLC5 conversion.
About the author
Ray has retired from Hallam-ICS, but his contributions to the company continue to be valued.
Read My Hallam Story
About Hallam-ICS
Hallam-ICS is an engineering and automation company that designs MEP systems for facilities and plants, engineers control and automation solutions, and ensures safety and regulatory compliance through arc flash studies, commissioning, and validation. Our offices are located in Massachusetts, Connecticut, New York, Vermont and North Carolina and our projects take us world-wide.